For flooring installers

Free flooring invoice generator

Bill by the square foot with the waste factor visible, price subfloor prep honestly, and list trim, underlay and haul-away as their own lines.

Square footage & waste factor
Subfloor prep separated
Materials at cost or supplied
100% free, no watermark
flooring invoice generator

Build your flooring invoice

Prefilled with an LVP install including subfloor prep. Swap in your measurements and rates, then download.

Choose a template Switch anytime — your details carry over
Your brand
From & Bill to
Invoice details
Line items
Description Qty Rate Amount
Tax & adjustments
Notes & terms
Live preview

What is a flooring invoice?

A flooring invoice is measurement arithmetic made legible. Rooms measured, waste factor applied, material square footage ordered — showing all three stops the argument about why 940 square feet of floor needed 1,030 square feet of plank.

Subfloor prep is the line that protects the job. Leveling compound, plywood replacement and moisture barrier are discovered after demolition, so the invoice should price them separately at rates agreed in the contract rather than absorbing them into the install price.

Everything around the field also gets billed: transitions, quarter round, stair nosing, toilet pulls, appliance moves, demolition and disposal. Each is real work, and each one omitted is margin donated to the customer.

Anatomy of the document

What to include

Everything below is already in the generator above — this is what each part is for.

Rooms and square footage

Areas installed with measured square footage, and the waste factor applied.

Material and product name

The exact product, colour and thickness installed, for warranty and future matching.

Install rate per square foot

Your labor rate by material type, since tile, LVP and carpet differ.

Subfloor prep

Leveling, plywood, moisture barrier and any repairs, priced separately.

Trim, transitions and stairs

Quarter round, T-mould, reducers, stair nosing and thresholds by linear foot or piece.

Demolition and disposal

Tear-out of old flooring, dumpster or haul-away fees.

How to use the generator

Three steps to a finished PDF

1

Enter the job

Client, address, rooms installed and the product used.

2

Bill field, prep and trim

Square footage at your install rate, then prep, materials, trim and disposal.

3

Download and send

Send the PDF at completion, or use progress lines on multi-room jobs.

Measuring, waste and change orders

Show the waste factor

Every install orders more material than the floor area — 5% for straightforward plank, 10% or more for diagonal, herringbone or heavy pattern match. Customers who see the field square footage and the ordered square footage as separate figures never question the difference. Customers shown only a total always do.

Price prep as a change order

  • Quote unit rates for leveling, plywood and moisture barrier in the contract, before demolition.
  • Photograph what you find and bill against those agreed rates.
  • Never absorb prep to keep the peace — it is the most common way flooring jobs lose money.

Bill the perimeter and the extras

Transitions, quarter round, stair nosing, toilet removal and resets, appliance moves, furniture handling, and the dump run. On a mid-size job these add up to a meaningful share of the total, and they are invisible unless you list them. Give each one a line and a rate.

Avoid these

Three mistakes that delay payment

Only a total square footage

Without the waste factor shown, the material quantity looks inflated.

Prep absorbed into the bid

Leveling and plywood discovered after tear-out is extra work and should be extra money.

Trim and disposal forgotten

They are hours and dump fees you already spent. Bill them.

FAQ

Common questions

Use the generator on this page: list rooms with measured square footage, bill your install rate per square foot, then add subfloor prep, materials with waste factor, trim, transitions and disposal.
Around 5% for straight-lay plank in simple rooms, and 10% or more for diagonal, herringbone or patterned installs. Show the field area and the ordered area separately.
Yes. Quote unit rates for leveling, plywood and moisture barrier in the contract, then bill what the job actually needed after tear-out.
Bill it as a line, or state in the contract that rooms must be cleared. Both are fine; doing it for free is not.
Bill labor per square foot, list the customer-supplied product for the record, and state that you do not warrant material defects you did not supply.