For carpenters & joiners

Free carpentry invoice generator

Bill shop time and site time at different rates, list lumber and hardware with the grade, and draw progress payments on longer builds.

Shop vs site labor
Lumber & hardware itemised
Progress draws supported
100% free, no watermark
carpentry invoice generator

Build your carpentry invoice

Prefilled with a built-in bookcase job. Swap in your labor, lumber and draws, then download.

Choose a template Switch anytime — your details carry over
Your brand
From & Bill to
Invoice details
Line items
Description Qty Rate Amount
Tax & adjustments
Notes & terms
Live preview

What is a carpentry invoice?

A carpentry invoice covers work that ranges from framing a wall to fitting a hardwood built-in, and the rate should not be the same for both. Separating rough and finish labor — and shop time from site time — is the simplest way to make a fair price look fair.

Materials carry more information in carpentry than in most trades. Species, grade and dimension change the cost substantially, so the invoice lists what was bought rather than "lumber", and the client can see why quarter-sawn white oak is not pine.

Built-ins and larger builds are milestone work: deposit for materials, a draw at installation, balance at completion. The invoice that supports draws keeps the shop funded without asking the client to trust you for the whole amount up front.

Anatomy of the document

What to include

Everything below is already in the generator above — this is what each part is for.

Scope of the build

What was made or installed, described concretely enough to match the drawing.

Labor by type and rate

Rough, finish and shop hours at their own rates, or a fixed price per element.

Lumber and sheet goods

Species, grade and dimension with quantities, at cost plus your markup.

Hardware and finish

Slides, hinges, fasteners, stain and topcoat, listed separately.

Shop time and setup

Milling, glue-up, assembly and finishing done off site, at your shop rate.

Deposit and draws

Materials deposit received and any progress payment applied against this invoice.

How to use the generator

Three steps to a finished PDF

1

Describe the build

Client, site, and what was built or installed on this stage of the job.

2

Bill labor, then materials

Site and shop hours at their rates, then lumber, sheet goods, hardware and finish.

3

Download and send

Apply the deposit or draw, then send the PDF for the balance.

Rates, materials and milestone billing

Two rates, not one

Finish carpentry and cabinetry demand a higher rate than framing and demolition, and shop time — where your tooling and space carry the cost — should be priced as its own thing. Clients accept tiered rates without complaint; they resent a single high rate applied to sweeping up.

Specify materials properly

  • Name species, grade and dimension: "5/4 x 6 clear cedar", not "decking".
  • Sheet goods by grade and core — cabinet-grade ply is not big-box sheathing.
  • Bill hardware separately; good slides and hinges are a real cost worth showing.

Draw against milestones on longer builds

A materials deposit, a draw at delivery or installation, and the balance on completion keeps cash flowing through a build without forcing the client into a single large payment. State each milestone in the contract, then show the deposit and draw applied on the invoice so the balance is unambiguous.

Avoid these

Three mistakes that delay payment

One blended labor rate

Either you underbill the finish work or you overbill the rough work.

"Materials" as a single line

Hardwood, plywood, hardware and finish are different costs and different decisions.

No deposit on custom work

Bespoke pieces have no resale value. Take the materials money up front.

FAQ

Common questions

Use the generator on this page: describe the build, bill site and shop labor at their own rates, then list lumber, sheet goods, hardware and finish, applying any deposit or draw already received.
Yes. Shop work carries your tooling and space overhead and is usually billed at a higher rate than on-site rough labor.
Enough to cover materials plus some shop time — commonly a third to a half. Custom work cannot be resold if the client walks.
By species, grade and dimension at cost plus a stated markup. Specific descriptions prevent the assumption that all wood costs the same.
Yes. Set milestones in the contract — deposit, delivery, installation, completion — and show each payment applied so the outstanding balance is clear.